Most homeowners start by choosing the appearance of their home. Then carefully consider the details of the use of space and materials. Problems that must be encountered if starting like this, that is, there is an inconsistency in usage and proportion size. The later appearance of the house the best way is to start by surveying the needs of the members of the house first. both functional and aesthetic needs when collected, a portion will be converted to usable space size, resulting in size, proportion, and appearance. Consistent with usage moreover, the size of the usable area can also be used as a starting point for roughly estimating construction design costs for people who want to build their own home.
We can estimate the cost of building a house from scratch. which the preliminary numbers were obtained. there will be quite a deviation from reality. But it will allow the homeowner to see the budget limit that they need to prepare for spending as a whole. With details of expenses that must be prepared it will be divided into 2 parts: design cost and construction cost.     Design rate most are calculated as a percentage of the construction cost. The architects association sets the standard for residential construction at 7.5% of the construction cost. The design cost will be more or less. In addition to depending on the construction area, there are other factors involved, including the difficulty of the design, level of service, reliability, etc. construction rates. They often vary according to the limitations of the location, environment, difficulty of construction work, labor costs, and construction material costs. And operating costs of contractors but if you want a cost figure that is closer to reality. It is necessary to complete the design first. Then calculate the construction cost from removing the amount of materials. And the amount of work coming out of the construction drawings including the contractor's operating expenses to be the total price this way we will get construction costs that are close to the truth. Including clearly seeing expenses separated by each work item. Or what we know well as boq (bill of quantity).
Selection of materials it is one step in the design work where the architect will assist the owner in selecting materials to be used in the construction work appropriately. Meets the needs in terms of functionality, beauty, and budget control. In cases where the owner must choose the materials himself, he should study and compare their properties. Difficulty of use, price, and consider the difficulty of procuring and repairing if damaged later. At present to facilitate and is a new option for job owners manufacturers of construction material products often provide products and installation services in the form of solutions for various parts of the house for owners to choose from instead of selling just the construction materials in pieces. They also provide a guarantee for the installation work. Helps reduce worries after construction work, such as roof tile work, vinyl door and window installation, garden paving, walkway paving, heat insulation installation, and bathroom renovation work, etc.
How long will it take to build a house? Can be considered from the time spent on design work. Or the length of time it takes to procure house construction plans combine this with the time it takes to build a house. Normally, architects usually take 2 months or more to design a house. Some houses whose owners are meticulous in their design may take more than a year to design. In terms of construction work, if we count the time it takes from sourcing contractors apply for permission to construct with the government. Until the construction of the house is completed take for example a house with a simple design and no complicated construction details. It usually takes approximately 8-12 months to complete the project, not including the duration of interior decoration work and landscaping around the house.
The most common problems that project owners do not want to encounter during construction work include construction work not being completed on schedule. Not in accordance with the agreement contractors abandon work, construction quality does not meet expectations, work does not match the design, work is not complete, construction work is protracted. Modifying the work site causes expenses to escalate, etc.  These problems often cause construction work to falter. owners and contractors feel worried. But the problems mentioned above can be controlled by having good quality construction plans. There are complete details of the construction work, there are people to supervise the construction work and there is a team of experienced construction technicians. Pay close attention to monitoring and correcting small errors before they develop into major problems. And most importantly, the owner of the work and the contractor must know and understand the contents of the drawings and construction work in the same direction. There is accurate and clear communication of information to each other at all times during construction work. Just like this, the construction work will proceed smoothly.

If you are interested in using the services of building a custom home by professional architects and designers. You can see beautiful home design ideas from wohnfabrik at www.wohnfabrik-phuket.com. And request service details at email: hello@wohnfabrik-phuket.com or ask for more details at contact center 0911645266.